| Sprint |
|
Client: Sprint Project Name: C.O. Generator replacement Location: Clinton, NJ Project Description: Removal of existing 350Kva Generator and associated transfer switches and wiring. Installation of new 750kva Generator with remote radiator. Project Responsibilities: All Electrical wiring, rigging, temporary backup generators, building modifications, development of removal and connection procedures, hydraulic piping. Project Challenges: Generator was located in basement of existing CO. A temporary generator needed to be supplied for building emergency services during construction, existing closet needed to be retrofitted into ne electrical closet, new doorways needed to be installed, walls needed to be removed and reinstalled, battery vaults and DC buss needed to be protected. Building power could not be disrupted. Project Accomplishments: Generator was installed with minimal impact to client staff and operations. Achieve all project milestones on time. Similar projects we’ve completed: Sprint Frenchtown CO generator replacement, Sprint Long Valley CO generator replacement. |

